skip to Main Content
BORED PILES WITH B360XP D2400 IN LONDON

BORED PILES WITH B360XP D2400 IN LONDON

PROJECT DESCRIPTION:

NEWFOUNDLAND TOWER, LONDON
Project description: Construction of foundation piles and secant walls
as permanent support for excavation
Main contractor: Canary Wharf Construction
Schedule: started on September 2015

PROJECT QUANTITIES AND GENERAL DATA:

Type of piles: Secant bored piles
Diameter: 1000 mm
Distance center-center: 800 mm (overlapping 200 mm)
Depth: 16 m
Reinforcement cages: full length – only secondary piles
Type of piles: Bored piles for foundations
Diameter: 1500 – 1800 – 2100 – 2400 mm
Depth: to 64 m
Reinforcement cages: full length

Back To Top

We respect your privacy

On this website we use first or third-party tools that store small files (cookie) on your device. Cookies are normally used to allow the site to run properly (technical cookies), to generate navigation usage reports (statistics cookies) we do not use any kind of (profiling cookies). We can directly use technical cookies, but you have the right to choose whether or not to enable statistical and profiling cookies. Enabling these cookies, you help us to offer you a better experience.

Cookie policy